Explore the BouwData Method
Download the Step-by-Step Guide
See how EVM really works
A practical walkthrough based
on real construction workflows
Join Peggy Bovens, founder of BouwData and the brain behind this approach, as she walks through the complete EVM process step by step. From preparing the BoQ breakdown and defining Work Results to forecasting costs and verifying progress through the Site Diary, Peggy shows how early decisions and transparent tracking prevent disputes and support better project outcomes — on site and at handover.
Ready to take your construction project to the next level?
BouwData ©
Fruithoflaan 122/91
B-2600 Berchem
+32 (0)498 91 98 96
©2026 All Rights Reserved by PB calc & consult | Terms and conditions | Terms of use

